Project Three

slide-2feca5b
slide-f145459
slide-444258c
slide-f4fec89

Objectives of the project:

Phase 1: polyacrylonitrile production

Phase 2: production of fiber carbon with resistance with 35Mpa

Geographical location of the project:

Lia industrial park,Qazvin,Iran

main contractor:

Phase 1 and 2 sepanta co ltd

Project Implementation Activities:

redesign and engineering, installation all mechanical equipments,

electrical and programming 

Key layout times:

april 2021

july 2021